It is a requirement of the Work at Height Regulations 2005 that unless a scaffold is assembled to a generally recognised standard configuration, eg NASC Technical Guidance TG20 for tube and fitting scaffolds or similar guidance from manufacturers of system scaffolds, the scaffold should be designed by bespoke calculation, by a competent person, to ensure it will have adequate strength, rigidity and stability while it is erected, used and dismantled.

At the start of the planning process, the user should supply relevant information to the scaffold contractor to ensure an accurate and proper design process is followed.  Typically this information should include:

Prior to installation, the scaffold contractor or scaffold designer can then provide relevant information about the scaffold.  This should include:

All scaffolding must be erected, dismantled and altered in a safe manner.  This is achieved by following the guidance provided by the NASC in document SG4 ‘Preventing falls in scaffolding’ for tube and fitting scaffolds or by following similar guidance provided by the manufacturers of system scaffolding.

For scaffolds that fall outside the scope of a generally recognised standard configuration the design must be such that safe erection and dismantling techniques can also be employed throughout the duration of the works. To ensure stability for more complex scaffolds, drawings should be produced and, where necessary, these may need to be supplemented with specific instructions.

Any proposed modification or alteration that takes a scaffold outside the scope of a generally recognised standard configuration should be designed by a competent person and proven by calculation.